Documentation

The paperwork, up front.

Certificate numbers, issuing bodies and dates for the cells inside our packs — plus an honest list of what is still missing. If a document does not exist yet, this page says so.

Four documents, three layers — and they are not interchangeable.

Most suppliers send you a certificate and let you assume it covers the battery. It usually covers the cell. Here is the difference, and where we stand on each layer.

Layer 1 · Cell

IEC 62619:2017 (CB Scheme)

Safety of secondary lithium cells for industrial use. Issued by a CB National Certification Body and traceable in the IECEE database — the number on our table can be checked independently.

On file
Layer 1 · Cell

UN 38.3 transport testing

Altitude, thermal, vibration, shock, short circuit, impact and overcharge — what a freight forwarder needs before the battery can fly or sail.

On file
Layer 2 · Pack

UL 2580 (pack level)

The one North American buyers and insurers actually ask for, and the one a cell certificate cannot replace. It tests the assembled pack with its BMS, contactors and enclosure.

PartialStatus depends on model — ask before you write it into a specification.
Layer 3 · Charger

UL 1564 / CSA C22.2 No. 107.2

Applies to the charger, not the battery. The 36–96 V cabinet chargers and the 3 kW on-board family we quote are certified by TÜV Rheinland of North America for the US and Canadian markets — a listing your inspector can act on, not a self-declaration.

On fileListing held by the charger manufacturer; certificate copy with quotation.

Cell documents on file

Five CATL cell types cover nine of the sixteen pack models; the remaining seven are being confirmed against the pack bills of materials. Cell build per pack is shown on each product page.

CellIEC 62619 CBUN 38.3Safety data sheetUsed in
CB220BC3 · 3.22 V · 173 Ah · 557.06 WhOn fileCBS 004951 0169 Rev. 00 · IEC 62619:2017 · TÜV SÜD PSB Pte Ltd, SingaporeIssued 2022-12-21 · Report 085-282260270-000On file01112200002353Y-1(E) · ST/SG/AC.10/11/Rev.7 §38.3Issued 2022-09-02 · Guangzhou Customs District Technology CenterOn file2023-A-65 · Chinese only · 02/03/2023MGT-258346, MGT-515346, MGT-515519
CB7S0BC5 · 3.22 V · 200 Ah · —Not in fileCB certificate not in the document setNot in fileUN 38.3 report not in the document setNot in fileSDS not in the document setMGT-515400
CB230BC3 · 3.22 V · 228 Ah · 734.16 WhOn fileCBS 004951 0023 Rev. 00 · IEC 62619:2017 · TÜV SÜD PSB Pte Ltd, SingaporeIssued 2021-04-06 · Report 211-282160078-000On file01112200004016-1 · ST/SG/AC.10/11/Rev.7 §38.3Issued 2022-12-06 · Guangzhou Customs District Technology CenterOn file2020-A-144 · English · 2020-07-20MGT-386456
CB780BC5 · 3.22 V · 268 Ah · 862.96 WhNot in fileCB certificate not in the document setOn fileRZUN2023-2958 · ST/SG/AC.10/11/Rev.7/Amend.1 §38.3Issued 2023-08-01 · CVC Testing, Guangzhou (CNAS L0095)On file2025-A-226 v1.8 · Bilingual · 2025-12-04MGT-258536, MGT-386536
CB240BC3 · 3.22 V · 302 Ah · —On fileJPTUV-120494 · IEC 62619:2017 · TÜV Rheinland Japan Ltd.Issued 2021-03-18 · Report CN21F0NC 001Not in fileUN 38.3 report not in the document setNot in fileSDS not in the document setMGT-386604, MGT-515302

Cell build per pack is derived from nameplate capacity and series string count, and is being confirmed line by line against the pack BOM. Where it matters to your approval, ask us and we confirm the exact cell model in writing.

What a cell certificate does not mean

Four things worth knowing before this ends up in someone's EHS file.

  1. A CB certificate covers a cell, not a battery. Your pack adds a BMS, contactors, fusing, a steel enclosure and a charging interface. None of that is in the CB report. Ask for the pack-level document for the exact MGT model.
  2. IEC 62619 is not UL 2580. A CB report does not satisfy an NRTL requirement and carries no UL mark. If your site, insurer or authority having jurisdiction asks for UL 2580, an IEC 62619 certificate will not be accepted in its place.
  3. UN 38.3 is a transport test, not an operating approval. It proves the cell survived shipping conditions. It says nothing about cycle life, BMS behaviour or how the pack performs in a freezer at −25 °C.
  4. A safety data sheet is not a certificate. It is a hazard-communication document for your safety team. It approves nothing and certifies nothing.

What we are still chasing

Updated as documents land. Nothing here is hidden behind a sales call.

CB · 268 AhIEC 62619 CB certificate for the CB780 cell — only the UN 38.3 report is in the set today.Not in file
All docs · 200 AhNo test documents for the CB7S0 cell in the current set, which is the cell build for MGT-515400.Not in file
UN 38.3 · 302 AhTransport report for the CB240 cell — CB certificate is on file, UN 38.3 is not.Not in file
SDS · 173 AhSafety data sheet exists but is Chinese-only — English version requested for North American sites.Partial
Pack · UL 2580Pack-level listing for the assembled MGT models. Confirm current status with us per model before quoting.Partial

Send us the requirement, not a compliment

Tell us the model and what your site needs — a UL 2580 listing, a CB report for a European parent company, UN 38.3 for a forwarder, or an insurer's checklist. You get the documents that actually apply, within 24 hours, and a straight answer where they don't exist.

Request the document pack

Tell us the model and the requirement and we send the PDFs that apply within 24 hours — including the full test report where the issuing laboratory allows redistribution. If a document does not exist for that model, we say so instead of sending something adjacent.